| Amoco
Technology Center
Tulsa, Oklahoma
- This project involved an economic
study for various alternatives to the present.
- Amoco Data Center Central Plant.
With a capacity of 2700 tons, the project.
- included life cycle cost analysis
for three chiller configurations and analysis of variable
speed versus constant volume pumping.
- Tulsa central control center
for World-wide computer operations.
- Required interconnection to existing
data center emergency systems.
Designed a 7,400sf telecommunications building that
contained 3,000sf of raised floor. A UPS and emergency
generator backed-up the critical systems .
- Facility functions as major satellite
communications center.
Visit
BP/Amoco's Website |
|
|