Amoco Business Center
Tulsa, Oklahoma

  • Chiller plant feasibility study with preliminary design.
  • Energy and construction cost analysis for multiple retrofit alternatives.
  • CHW distribution system analysis and retrofit.
  • 440,000 sf. 3-building 14-story high-rise complex 70,000 sf critical data center facilities.
  • $3,900,000 (mechanical / electrical estimate).
  • 2,590 tr chiller capacity with hydronic economizer, and primary / secondary pumping system.
  • Design and installation of a new 12 Floor Bus-Duct Riser for 0% down-Time redundancy of critical and data systems.